»  Cycling  »  Clothing  »  Shorts  »  Troy Lee Designs Flowline Short
  • Troy Lee Designs Flowline Short
  • Troy Lee Designs Flowline Short

Troy Lee Designs Flowline Short

Flowline shorts combine comfort, top technology and minimalist design. Full description
Brand:
25390602-30
25390602-34
25390602-36
Code:
887202442339
887202442353
887202442360
EAN:
3 - 4 days
3 - 4 days
3 - 4 days
Availability:
 
Barva:
Troy Lee Designs Flowline Short
Troy Lee Designs Flowline Short
Troy Lee Designs Flowline Short
Troy Lee Designs Flowline Short
navy - S (30)
3 - 4 days
86,60 €
navy - L (34)
3 - 4 days
86,60 €
navy - XL (36)
3 - 4 days
86,60 €
Cena včetně DPH
86,60 €
Doporučená cena výrobce: 96,25 €
86,60 €
Doporučená cena výrobce: 96,25 €
86,60 €
Doporučená cena výrobce: 96,25 €
+
-
Specification Parameters Comments (0)

Are you looking for a combination of comfort, high technology with convenience and affordability? Flowline shorts are designed for passionate bikers and offer a minimalist design without compromising on quality and fit.

  • Ride Fit cut - standard seat height, casual cut, universal use
  • Bluesign® approved fabrics guarantee environmental friendliness
  • two practical hand pockets and a back zipped pocket
  • adjustable waist width
  • zip and snap closure
  • silicone printon the inner waist ensures that the shorts stay in place
  • material: 89% recycled polyester, 11% spandex with DWR treatment

Product parameters

Usage: dospělé

Product comments

Nobody has commented on this product yet.

Add comment

Downloads

This product has no files to download.

We recommend

Fox Defend Jersey
Men's short sleeve jersey with strategically placed ventilation zones.
S , M , L , XL , XXL
64,15 €
in stock
new
Horsefeathers Rooter
The Rooter technical T-shirt is designed for versatile use - it's great for cycling, running, mountain hiking and everyday wear.
S , M , L , XL
34,05 €
3 - 4 days
Troy Lee Designs Skyline Shadow Jersey
Cycling jersey with short sleeves for maximum comfort and functionality.
camo brick - M
76,15 €
68,55 €
3 - 4 days
Force Mild Jersey
Cycling jersey with short sleeves.
S , M , L , XL , XXL
48,10 €
40,45 €
3 - 4 days
new
Horsefeathers Fury
Are you looking for a T-shirt that can handle tough trails while still looking like a piece from your favorite streetwear collection?
S , M , L , XL , XXL
44,10 €
3 - 4 days
 


Similar products

new
Fox Womens Flexair Short
The Fox Flexair women's loose shorts without a liner stand out for their lightness, breathability and flexibility.
XS , S , M , L , XL
104,25 €
in stock
Troy Lee Designs Flowline Short
Flowline shorts combine comfort, top technology and minimalist design.
S (30) , L (34)
96,25 €
86,60 €
3 - 4 days
Ranger Lined Short
The innovative Fox Ranger loose shorts with inner liner, a bestseller and the best choice on the market in terms of price/performance ratio.
XS (28) , S (30) , M (32) , L (34) , XL (36) , XXL (38) , XXXL (40)
100,25 €
in stock
POC Infinite All-mountain Shorts
Medium strong and durable cycling shorts for trail and enduro riding.
XL , XXL
144,00 €
115,20 €
3 - 4 days
Gore C5 Paclite® GTX Trail Shorts
Lightweight and easy to pack shorts for wet weather. The end of wet backs in the autumn marast!
black - XL
160,40 €
3 - 4 days
 
Powered by Provozováno na systému NetShops
Cookies Cookies
We need your consent to the use of individual data so that they can show you information about your interests, among other things. Click "OK" to give your consent.
You can refuse consent here.
Here you can customize cookies by category, according to your own preferences.
Technical cookies
Show more
Advertising cookies
Show more
Analytical cookies
Show more
Personalized cookies
Show more